The Masterplan

Northgate is planned as a single campus of four buildings totalling 1.54 million square feet, laid out around a central green spine rather than a shared truck court. Trailer movements are kept to the outer ring so the interior of the park stays walkable.

Roughly nine acres along the north edge are given over to a restored wetland and a two kilometre trail loop that connects every building entrance to the transit stop on Ridgehill Parkway.

This is a demonstration page. In the reference build it carries the same header, footer and section structure as the home page.

Back to the park
Solar ready roofs
Every roof in the campus is solar ready